CIP RC/PT Girder Help

Load Factors

The default load factors used inCIP RC/PT Girder are from LRFD Table 3.4.1-1 and Table 3.4.1-2 and are listed below.

AASHTO (LFD)

The default LFD load factors are taken from Table 3.22.1A and are listed below. LEAP@CIP RC/PT Girder treats live load as permit loads for combination 1B.

    D Live Load Permit Tu g
Load Factor Group 1 Gamma 1.3 1.3 N/A 1.0 1.0
Beta 1.0 1.67 N/A 0.0 2.0
Load Factor Group 1B Gamma 1.3 1.3 N/A 1.0 1.0
Beta 1.0 N/A 1.0 0.0 0.0
Service Load Group 1 Gamma 1.0 1.0   1.0 1.0
Beta 1.0   1.0 0.0 0.0
Service Load Group 1B Gamma 1.0 1.0   1.0 1.0
Beta 1.0   0.1 0.0 0.0
Limit State   DC DW LL PL Tu Tg
Strength I Max 1.25 1.5 1.75 1.75 1.2 0.0
Min 0.90 0.65 1.75 1.75 0.5 0.0
Strength II Max 1.25 1.5 1.35 1.35 1.2 0.0
Min 0.90 0.65 1.35 1.35 0.5 0.0
Service I Max 1.00 1.0 1.00 1.00 1.2 0.5
Min 1.00 1.0 1.00 1.00 1.0 0.5
Service II Max 1.00 1.0 0.8 0.8 1.2 0.5
Min 1.00 1.0 0.8 0.8 1.0 0.5